Integrated Systems Testing, governed to Ready‑for‑Service.
Your commissioning team runs IST (Level 5). CitiriOS governs the owner’s side — witnessing the campaign, accepting each script as evidence, and gating beneficial use on it.
Level 5 proves the systems fail over. It doesn’t prove you’re ready to accept them.
Data‑center commissioning runs L1 (factory) through L5 (integrated systems testing) — the pull‑the‑plug scenarios that prove utility, generator, UPS, and cooling ride through failure together. The testing is the commissioning agent’s to perform. Deciding it’s enough — accepted, current, and gated to beneficial use — is the owner’s.
Delivery scope — performing IST
- The CxA and integrators execute the L1–L5 scripts.
- Results land in a commissioning report and a binder.
- Proves the installed systems meet the design intent.
- Doesn’t, on its own, authorize beneficial use.
Owner scope — accepting & gating it
- Witness the campaign and capture each script as evidence.
- Accept results through review — expired or partial stops counting.
- Tie an IST pass to the RFS / beneficial‑use gate as Go/No‑Go.
- Hold a defensible record for the lender, insurer, and tenant.
From test script to beneficial use.
CitiriOS carries the owner’s thread from a witnessed script to an authorized handover — with the delivery hand‑off marked, not blurred.
IST isn’t a product — it’s a job these capabilities do.
CitiriOS doesn’t perform testing. It governs the owner’s witnessing, evidence, and gating — through the capabilities below.
Inspections & Field Execution
Witness the IST campaign and capture each script as an evidence candidate.
Evidence & Gate Governance
Accept results and gate RFS / beneficial use on an IST pass.
Operational Readiness
See IST alongside every other readiness domain in one Ready Score.
Data Centers
The full data‑center readiness picture — commissioning to beneficial use.
Govern your IST campaign to beneficial use.
Book a demo built around your Level 5 campaign — witnessing, evidence acceptance, and the gate to Ready‑for‑Service.
IST, Level 5, commissioning levels (L1–L5), Ready‑for‑Service, and beneficial use are data‑center industry terms. CitiriOS governs the owner’s witnessing, evidence, and gating — it does not perform commissioning or testing, and integrates with your CxA’s tools. Ready Score is a CitiriOS capability. Opti suggests and cites; people accept evidence and decide. Figures shown are illustrative.